Recent projects

GODLEY QUAY, CASHMERE ROAD & WRIGHTS

Project Value: $1,742,000.00
Date Started: 14/08/2017
Date Completed: Estimated 20/04/2018
Client: Christchurch City Council
Location: Lyttelton, Cashmere & Addington
Scope of Works: 3 locations of watermain installs which consisted of 1km of 200mm – 300mm of CLDI & 1.8km of DN250 PE PN16 which is all installed Via Open Cut trenching, UINZ were the main contractor for this project.

We completed all the major connections to ex. mains

UINZ are completing all connections and Testing.

SOUTHBROOK/SOUTHBELT INTERSECTION

Project Value: $654,000.00
Date Started: 14/03/2017
Date Completed: 16/06/2017
Client: Isaac’s / Waimak District Council
Location: Southbrook road, Rangiora
Scope of Works: Supply and install 900mm storm water down the main street with multiple Manholes and upgrading ex. Concrete works along the way, also installing a new water main over 450m with pipe ranging from 63mm to 300mm PE & PVC including all new connections and road crossings.

UINZ are completing all connections and Testing.

MELVERN HILLS PIPELINE

Project Value: $186,000.00
Date Started: 20/02/2017
Date Completed: 24/03/2017
Client: Selwyn District Council/Sicon
Location: Sheffield, Melvern hills
Scope of Works: Open trench and Directional Drill a new DN 125 PE main through some rough terrains to replace an old AC watermain.

UINZ are completing all connections and Testing.

CASTLE HILL ALPINE VILLAGE STAGE 5V

Project Value: $298,000.00
Date Started: 21/02/2016
Date Completed: 24/04/2017
Client: Aurecon
Location: Castle hill village
Scope of Works: supply and install of all underground services including the gravity sewer main, storm water, water mains, power & fibre optic cables servicing 19 Residential Lots.

UINZ are completing all connections and Testing.

CORSAIR DRIVE WIGRAM & CAULFIELD AVE LONGHURST (MIKE GREER DEVELOPMENTS)

Project Value: $685,000.00
Date Started: 21/11/2016
Date Completed: 7/04/2017
Client: Bonish
Location: Wigram skis & Halswell – Christchurch
Scope of Works: To supply and install all underground utilities from gravity wastewater. Stormwater, water reticulation and common services, liaising with all providers and sub-contractors and working in with the earthmovers and roading contractor’s South East earthworks.

UINZ are completing all connections and Testing.

WESTPARK SUBDIVISION

Project Value: $1,356,000.00
Date Started: 23/08/2016
Date Completed: 10/5/2017
Client: Aurecon
Location: Oxford road, Rangiora
Scope of Works: supply and install of all underground services including the gravity sewer main, storm water, water mains, power & fibre optic cables servicing 105 Residential Lots.

The storm water system Ranging from 100mm pipe to 900mm along with culverts and soak pits.

UINZ are completing all connections and Testing.

ST ALBANS/MAIREHAU STORMWATER REPAIRS

Project Value: $156,000.00
Date Started: 1/06/2016
Date Completed: 10/07/2016
Client: Fulton Hogan SCIRT
Location: Multiple locations
Scope of Works: To Repair Stormwater pipes from 150mm to 600mm within the council assets using Gibaults and other mechanical fittings.
UINZ completed all connections and Testing.

Birchs Road:Trents Road Watermain

BIRCHS ROAD/TRENTS ROAD WATERMAIN

Project Value: $112,559.00
Date Started: 9/05/2016
Date Completed: 31/05/2016
Client: Selwyn District Council/Sicon
Location: Prebbleton
Scope of Works: replacing old asbestos mains in prebbleton is becoming one of SDC top priorities which we took on the task of installing 380m of DN125 over to streets, including installing new fire hydrants and connection up ex. Houses to new line
We used our Directional Drilling to complete this job which minimized the effects on the environment.
UINZ completed all connections and shutdown which included new sluice valves, fire hydrants and Testing and chlorination.
Job was completed on time and within budget.
Reference: Darryl Collins – 027 886 3636

Burwood West Pressure Main

BURWOOD WEST PRESSURE MAIN

Project Value: $1,546,000.00
Date Started: 18/01/2016
Date Completed: Estimated Completion Date 10/06/2016
Client: Downers SCIRT
Location: New Brighton Road/ANZAC Drive, Burwood
Scope of Works: to install 1.4km of new PE pressure main (250mm and 400mm) Via Open Cut Trenching and Directional Drilling from new pump stations on Lake Tce and Basset street to ex. Gravity feed on ANZAC drive, we also install a new custom manhole that we connected a new 975mm concrete PE lined pipe.
UINZ completed all connections and Testing.
Job was completed on time and within budget.
Reference: Daniel Fryer – 027 886 3636

Tosswill Road Watermain

TOSSWILL ROAD WATERMAIN

Project Value: $143,000.00
Date Started: 5/10/2015
Date Completed: 27/10/2015
Client: Selwyn District Council/Sicon
Location: Prebbleton
Scope of Works: the project consisted of a total 420 meters of pipeline which included 180m of DN180 & 240m of DN250, connecting from a new pump station and linking to ex. Prebbleton mains.
We used our Directional Drilling to complete this job which minimized the effects on the environment.
UINZ completed all connections and shutdown which included new sluice valves, fire hydrants and Testing and chlorination.
Job was completed on time and within budget.
Reference: Darryl Collins – 027 886 3636

Burnham School Road Watermain

BURNHAM SCHOOL ROAD WATERMAIN

Project Value: $95,150.00
Date Started: 6/07/2015
Dated Completed: 31/07/2015
Client: Selwyn District Council/Sicon
Location: Rolleston
Scope of Works: Burnham school road project was designed to eliminate an old pump station feeding t rural properties on the outskirts of Rolleston, the job consisted of 1.3km of DN110 which was Traditionally trenched and reinstated back to original state.
UINZ completed all connections and shutdown which included new sluice valves, fire hydrants and Testing and chlorination.
Reference: Darryl Collins – 027 886 3636

Station Street Watermain

STATION STREET WATERMAIN

Project Value: $65,000.00
Date Started: 2/03/2015
Date Completed: 27/03/2015
Client: Selwyn District Council/Sicon
Location: Leeston
Scope of Works: leeston was due for an up sized main to replace and ex. 63mm PE, we excavated 250m and installed a 150mm pvc main including 2 x fire hydrants and reconnection over a dozen ex. Properties.
UINZ completed all connections and shutdown which included new sluice valves, fire hydrants and Testing and chlorination.
Reference: Darryl Collins – 027 886 3636

Lincoln 66KVA Power Upgrade

LINCOLN 66KVA POWER UPGRADE

Project Value: $214,000.00
Date Started: 16/02/2015
Date Completed: 25/04/2015
Client: Orion/Independent Line Services
Location: Lincoln
Scope of Works: UINZ were taken on by ILS to complete all civils of HV and LV undergrounds this consisted of 1.4km of trenching and 800m of directional drilling as well as all joints pits and new pole holes.
Reference: Peter Macefield – 021 221 1226
Job was completed on time and within budget.

Castlehill Alpine Village

CASTLEHILL ALPINE VILLAGE

Project Value: $152,000.00
Date Started: 3/11/2014
Date Completed: 12/12/2014
Client: Aurcon/Norwest Contracting Ltd
Location: Castlehill Alpine Village
Scope of Works: Having only just completing our 1st full sub-division castle hill was a major success and well organized working for aurecon through Norwest. We hit targets with ease battling though the rough castle hill conditions. Installing a range of services including water, power, chorus, sewer and drainage.
Reference: Andy McManus– 021 221 1226
Job was completed on time and within budget.