Scope of works
UINZ had been asked to complete watermain upgrades on Westminster St and Dee St, St Albans.
This job was increased to several water main relocations in surrounding streets to accommodate new SW water being laid by others.
The project went well and was finished on budget and all final connections completed during the night to accommodate location Businesses.
We used both trenching and trenchless technology to complete the works which minimised disruption and road closures.
The pipeline has not be renewed since the 1960s. With a lot of emphases on safety and quality, UINZ worked in closure with Mobil , McConnel Dowell and Taurus engineering. This allowed UINZ to install the DN150 pipe with minimal disruption to the area and at a high quality finish and performing at a very high safety standard.